top of page
Rodman

Rodman

install guide

factory manual

Controller

WIRING

Connect solar power

VIDEOs

Bandito

Bandito

factory manual

Controller

Recalone
Recalone.jpg

factory manual

Recalone

receiver

Key Boom Gate
Key Boom.jpg

Boom Gate

factory manual

Controller manual

maintenance

Keypad
130129175260_1plus_seld.jpg

Wireless Keypad

factory manual

Video

Video

Rodman

INSTALL

24v

PART 1

​

 

Part 1 video covers the important aspect of mounting a swing motor. Then ends on connecting (24v) power. 

 

24v

PART 2

Programming

 

In part 2 we go through the programming steps on the 24v model using the impressive 14A control unit : 

- Connect accessories

- Add remotes & set functions

- Change gate direction

- Set gate limits

​

BE SOCIAL

HELLO

There's lots of good stuff coming up you won't want to miss any of it.

  • Instagram
  • Facebook
  • LinkedIn
  • YouTube

team@downee.com.au

 

​

VIC/TAS  03 9300 5160

​

NSW  02 8785 5800

​

QLD  07 3434 3400


SA/NT  08 8139 4720

 

WA  08 9241 7300

​

NZ  09 277 0040

© Downee 2023

Subscribe to our newsletter • Don’t miss out!

Thanks for subscribing!

bottom of page